PARK AREA

An example of a plot-divided site concept:

Area

  • More than 60 hectares (600,000 m2) of industrial land with a current Local Development Plan
  • Possibility to choose the location of the plot and selection of any plot size
  • The land use intensity rate reaches 80% of the total selected area

Utilities

  • Developed area with all utility availability
  • Electricity -power transmission line which gives the possibility of electricity supply of 6 kV , 20 kV and 110 kV
  • Sewer -industrial waste is discharged to the sanitary sewer system through pipe Ø 200
  • Gas -high-pressure gas pipeline Ø 250. (Polish Gas – GZ 50 , high energy)
  • Water -urban water supply pipeline fed Ø 110
  • Closeness of waste water treatment plant.

Administration

  • In the price of the purchased plot, we offer an environmental impact report (individual for each investor)
  • We work closely with the Municipality of Brzeg Dolny, which offers assistance in the efficient handling of formalities related to the preparation, operation and conduct of investments
  • We provide assistance in recruiting qualified staff at all levels
  • We work with proven designers, supervisors and contractors for industrial projects

Problem with getting environmental decisions?

We assist investors in obtaining environmental decisions

Efficient, fast and accurate process of obtaining environmental decisions. Entering into cooperation with us will make it possible.